Deployment Processes
The deployment process at UniAPT is designed to be efficient, reliable, and scalable, ensuring that new features, updates, and fixes are delivered to our users smoothly and without disruption.
Deployment Process Overview
Code Commit and Review
Developers commit code to a version control system (like Git).
Code undergoes peer review for quality assurance.
Automated Testing
Commit triggers automated testing (unit, integration, functional tests) in the CI pipeline.
Build Process
Successful test runs lead to the building of the application, often containerized using tools like Docker.
Staging Environment Deployment
Deploy the build to a staging environment that closely mimics production.
Perform additional manual and automated tests.
Production Deployment
After validation in staging, the application is deployed to the production environment.
This might involve blue-green deployment or rolling updates for high availability.
Monitoring and Post-Deployment Testing
Continuous monitoring of the application for performance and errors.
Post-deployment tests to ensure everything operates as expected in the production environment.
Docker-Based Deployment
Dockerfile (for Containerization)
Jenkinsfile (for CI/CD Pipeline)
Deployment Line of Process
Code Commit →
Automated Testing →
Build Creation →
Staging Deployment & Testing →
Production Deployment →
Monitoring & Post-Deployment Testing
Expanding further on UniAPT's deployment processes, let's delve into more advanced strategies and best practices that are part of our deployment lifecycle. These advanced strategies help us maintain high availability, ensure scalability, and facilitate rapid rollbacks when necessary.
Advanced Deployment Strategies
Blue-Green Deployment
Purpose: Minimize downtime and reduce risk by running two identical production environments.
Process:
Blue Environment: Current live version.
Green Environment: New version to be released.
After testing in Green, traffic is switched over from Blue to Green.
Blue environment is kept ready for immediate rollback if needed.
Canary Releases
Purpose: Gradually roll out changes to a small subset of users before a full rollout.
Process:
Deploy the new version to a small percentage of production servers.
Monitor performance and user feedback.
Gradually increase traffic to the new version.
Feature Toggles
Purpose: Enable or disable features without deploying new code.
Implementation:
Implement feature flags in the codebase.
Control feature availability through configuration.
Database Migration Strategies
Purpose: Ensure data integrity and minimize downtime during database schema changes.
Process:
Use tools like Liquibase or Flyway for version-controlled database migrations.
Perform backward-compatible schema changes.
Gradual migration of data if necessary.
Blue-Green Deployment Script
Sample Blue-Green Deployment Script (Bash)
Post-Deployment Procedures
Monitoring and Logging
Tools: Prometheus for monitoring; ELK Stack for logging.
Purpose: Ensure new deployments are performing as expected and identify any issues immediately.
Performance Testing
Purpose: Verify that the new deployment meets performance benchmarks.
Tools: Apache JMeter or similar for load testing.
User Feedback
Purpose: Gather immediate feedback from end-users on the new deployment.
Methods: User surveys, monitoring user forums, feedback widgets.
Documentation and Reporting
Purpose: Document the deployment process and outcomes.
Process: Update project documentation; report deployment outcomes to stakeholders.
UniAPT’s deployment process, enriched with advanced strategies like blue-green deployments, canary releases, and feature toggles, ensures that our application deployments are smooth, risk-averse, and user-focused. With a strong emphasis on post-deployment monitoring and continuous feedback, we maintain high service standards while continuously innovating and improving our product offerings.
Last updated